Work due on ‘at risk’ rail embankment

placeholder image

TRANSLINK is to embark on major engineering work to prevent erosion and undercutting of the railway embankment next the River Bann.

The scheme, aimed at shoring up the river bank between Coleraine and Castlerock with ‘rock armour’, is expected to cost over £0.273m.

Details of the plans are contained in documents submitted alongside an application for the licence required for work in marine environments.

“There is currently a risk of ongoing erosion and undercutting of the embankments due to high flow velocities and extreme water levels unless these sections are protected,” states the Construction Environmental Management Plan.

Read the full story in this week's Chronicle

Related topics:
Powered by
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice